Monday, November 21, 2011

Trail ride


Greg needed a break after seeing me bolt that steel beam in the ground to shore up the corner post. I suggested some trail riding in the rain to take his mind off from de-bugging the job.
The foundation works well but it wasn’t without its problems. After backfilling the dirt, the pressure treated timbers moved in the increments of inches. Some of them needed the persuasion of a sledgehammer to make them line up properly! In the winter the frozen ground had to be chipped with a steel pitch bar for some wiggle room.

0 Comments:

Post a Comment

<< Home